By October 22, 2024October 29th, 2024No Comments

Rock Face Stabilisation

Location: Handbridge – Chester

Task: Rope Access Rock Face Stabilisation

Project Overview: Our client approached us after receiving reports from the resident of large rocks falling into their back garden. Due to the works being at height with restricted access we carried out vegetation clearance and de-scaled all loose rock from the face via Rope Access. This allowed a Geotechnical Engineer to survey the area.

Contact Us

For More Information, Contact Infinite Access Services

Our Work

It was proposed that a Rock Netting / Soil Erosion Matting system be installed to secure the rock face and make the area safe.

Given the close proximity of the rock face to the residential property a load bearing scaffold was erected to protect the house during removal of a large brick dentition section built into the rock face.  To prevent a large section of rock potentially dislodging during de-scale we installed a temporary Rock Netting system over it before using mechanical breakers to remove.  This allowed us to catch all debris in small pieces and then release in a controlled manner.  This ensured a safe working environment for our team and zero property damage.

Our highly experienced Geotechnical Rope Access team installed:

  • 12 x Earth Driven Anchors at the crest
  • 20 x Rock Anchors at the bottom using a suspended drilling rig
  • 18 x Geotextile profiling anchors throughout to ensure soil erosion matting is effectively held to the face
  • MacMatR Green Rock Netting System

All works were completed on time and within budget

Using Rope Access we were able to complete all works safely and efficiently ensuring our client received the most cost effective solution and the resident had minimal disruption.

Recent ProjectsContact Us

Stay Up To Date With Infinite Access Services

Check out our socials to stay up to date with our current work and previous projects.

Get In Touch

Contact Us

Our team has been an integral part of this project build for the past 9 months and is still continuing to support the build with Structural Steelwork Coatings and Steel Erecting / Fabrication Teams

This has been a project full of high risk activities that our expert teams have carried out safely due to their experience and knowledge.

Contact Us

Contact Infinite Access Services